BR1 · BR2 · BR3 · £5,000 – £9,000

Full bathroom installation in Bromley

Complete rip-out and refit — plumbing, electrics, tiling and fit-out, one team start to finish.

Fully renovated bathroom with freestanding bath and metro tiling
Bathroom installation in Bromley

The definitive Bromley job is the 1930s semi refit: knock the separate WC through into the bathroom, replace the gravity system's tired shower with a proper thermostatic mixer off an upgraded cylinder, and turn two cramped 1935 rooms into one genuinely good one. These houses have accessible floor voids and a external stack behind the bathroom, so layout changes are cheaper than owners expect. The airing cupboard usually gives up its cylinder for storage if we move to a combi — a decision we cost both ways at survey.

The houses we see in Bromley

The core is 1930s semi-detached — bay fronts, mock-Tudor gables, a family bathroom over the hall and a separate WC beside it. Petts Wood and West Wickham add chalet bungalows with bathrooms downstairs and loft rooms above. Bickley and Shortlands have larger Victorian and Edwardian villas, often with two or three bathrooms already. Beckenham mixes Victorian terraces with mansion flats. What almost all of it shares: original gravity hot-water systems in various states of replacement, and lofts that have either been converted or are about to be.

What bathroom installation involves

A full bathroom installation in south London costs £5,000–£9,000 excluding VAT and the suite, and takes two to three weeks. That covers rip-out, first-fix plumbing and electrics, waterproofing, tiling, fit-out and certification — the labour-only figure national guides quote at £2,000–£4,000 buys a like-for-like swap, not a full renovation.

This is for you if

  • The bathroom is original to the house and everything needs replacing
  • There is a persistent leak, damp patch or failed sealant you keep re-doing
  • You want the layout changed — bath out, shower in, toilet moved
  • You have bought a suite from a showroom and need it fitted properly
  • The extractor has never worked and the room grows mould every winter
  • You are renovating before selling or letting

What's included

  • Free home survey and a fixed written quote before anything starts
  • Full strip-out and disposal, floor made good and levelled
  • First-fix plumbing and electrics, moved where the new layout needs them
  • Waterproof tanking to wet areas before a single tile goes on
  • Tiling, flooring, sanitaryware, brassware and glass fitted and sealed
  • Part P electrical certification and extractor ventilation sign-off

The standard we work to

Bathroom electrics are notifiable under Part P and certified to BS 7671 Section 701 (zones); ventilation to Building Regulations Part F.

The full write-up — costs, timings and the questions people ask — is on our full bathroom installation page. Prices and standards are the same in every town we cover.

At a glance
Guide range£5,000 – £9,000
Typical duration2–3 weeks
ComplianceBathroom electrics are notifiable under Part P and certified to BS 7671 Section 701 (zones)

Guide ranges for budgeting, excluding VAT. We confirm a fixed price after a free home survey — the price we agree is the price you pay.

Bathroom installation in Bromley

Two quick steps — we know these houses.

No account, no obligation. We only use this to prepare your quote.

Bathroom installation in Bromley?

Guide range £5,000 – £9,000 excluding VAT, typically 2–3 weeks. Free survey, fixed written quote.

Start your quote 020 3051 9155