KT1 · KT2 · £5,000 – £9,000

Full bathroom installation in Kingston upon Thames

Complete rip-out and refit — plumbing, electrics, tiling and fit-out, one team start to finish.

Fully renovated bathroom with freestanding bath and metro tiling
Bathroom installation in Kingston upon Thames

A Canbury or Fairfield cottage refit is a craftsman's job: the room is small, out of square, and the walls are a lottery of lath, bonding and previous owners' decisions. We true the walls with backer board before tiling rather than chasing straightness with adhesive — the only way metro tiles stay honest on cottage walls. Riverside apartment refits are the opposite: square concrete boxes where the work is logistics — agent consent, lift slots, protected corridors — which we price in rather than discover.

The houses we see in Kingston upon Thames

Canbury and Fairfield are flat-fronted Victorian cottages — charming, small, and structurally quirky: out-of-square rooms, shallow joists, bathrooms added into what were bedrooms or extended into the yard. Norbiton and the Berrylands direction are 1930s semis with conventional upstairs bathrooms. The riverside is modern apartment stock from the 1980s to brand new, all leasehold, with communal risers and management processes. Coombe, to the east, is large detached houses with multi-bathroom renovations.

What bathroom installation involves

A full bathroom installation in south London costs £5,000–£9,000 excluding VAT and the suite, and takes two to three weeks. That covers rip-out, first-fix plumbing and electrics, waterproofing, tiling, fit-out and certification — the labour-only figure national guides quote at £2,000–£4,000 buys a like-for-like swap, not a full renovation.

This is for you if

  • The bathroom is original to the house and everything needs replacing
  • There is a persistent leak, damp patch or failed sealant you keep re-doing
  • You want the layout changed — bath out, shower in, toilet moved
  • You have bought a suite from a showroom and need it fitted properly
  • The extractor has never worked and the room grows mould every winter
  • You are renovating before selling or letting

What's included

  • Free home survey and a fixed written quote before anything starts
  • Full strip-out and disposal, floor made good and levelled
  • First-fix plumbing and electrics, moved where the new layout needs them
  • Waterproof tanking to wet areas before a single tile goes on
  • Tiling, flooring, sanitaryware, brassware and glass fitted and sealed
  • Part P electrical certification and extractor ventilation sign-off

The standard we work to

Bathroom electrics are notifiable under Part P and certified to BS 7671 Section 701 (zones); ventilation to Building Regulations Part F.

The full write-up — costs, timings and the questions people ask — is on our full bathroom installation page. Prices and standards are the same in every town we cover.

At a glance
Guide range£5,000 – £9,000
Typical duration2–3 weeks
ComplianceBathroom electrics are notifiable under Part P and certified to BS 7671 Section 701 (zones)

Guide ranges for budgeting, excluding VAT. We confirm a fixed price after a free home survey — the price we agree is the price you pay.

Bathroom installation in Kingston upon Thames

Two quick steps — we know these houses.

No account, no obligation. We only use this to prepare your quote.

Bathroom installation in Kingston upon Thames?

Guide range £5,000 – £9,000 excluding VAT, typically 2–3 weeks. Free survey, fixed written quote.

Start your quote 020 3051 9155