Walk-in shower installation in Greenwich
Bath-to-shower conversions and low-level walk-in showers — done in days, certified properly.

In East Greenwich and Charlton terraces the bath-to-shower conversion is the standard four-to-six-day job. In the Georgian houses it comes with a design duty: a frameless walk-in with a panelled reveal reads correctly in a 1820s room where a chrome cubicle would be vandalism, and we draw it before anyone commits. On the peninsula the conversion is usually enclosure-to-walk-in — builder-grade cubicles swapped for full-height glass — within the lease's floor build-up limit and the HIU's real flow rate.
The houses we see in Greenwich
West Greenwich and the streets up to the park are Georgian and early-Victorian townhouses — flat-fronted brick, sash windows, and bathrooms retrofitted at every period since 1900, some elegantly, some appallingly. Maze Hill and Westcombe Park are large Victorian villas, many converted to flats. East Greenwich and Charlton are conventional Victorian terraces. The peninsula is post-2000 apartment stock: concrete frames, internal bathrooms, mechanical ventilation and heat interface units.
What walk-in showers involves
A bath-to-walk-in-shower conversion in south London costs £2,800–£5,500 excluding VAT and takes four to seven days. It is the fastest meaningful bathroom upgrade there is: the bath comes out, a low-profile tray and glass go in, the exposed wall is re-tiled and the plumbing adapted — without touching the rest of the room.
This is for you if
- Nobody in the house has used the bath in years
- Stepping over the bath edge is getting harder for someone
- The over-bath shower leaks at the screen however you seal it
- You want a second shower instead of a rarely-used second bath
- A dated shower cubicle with a high step and mouldy frame
- Preparing a home for older relatives moving in
What's included
- Bath removed, wall made good, floor levelled where the bath sat
- Low-profile (40mm) tray or level-access former, your choice
- Re-tiling of the exposed wall area, blended or contrasted deliberately
- Glass screen or enclosure sized to the room and the user
- Thermostatic shower valve — no scald risk, stable temperature
- All plumbing and electrical work certified
The standard we work to
Electric showers and any new circuits notifiable under Part P; thermostatic mixing valves recommended (and required in adapted bathrooms).
The full write-up — costs, timings and the questions people ask — is on our walk-in shower installation page. Prices and standards are the same in every town we cover.
| Guide range | £2,800 – £5,500 |
| Typical duration | 4–7 days |
| Compliance | Electric showers and any new circuits notifiable under Part P |
Guide ranges for budgeting, excluding VAT. We confirm a fixed price after a free home survey — the price we agree is the price you pay.
Walk-in showers in Greenwich
Two quick steps — we know these houses.
No account, no obligation. We only use this to prepare your quote.
Walk-in showers in neighbouring towns
Walk-in showers in Greenwich?
Guide range £2,800 – £5,500 excluding VAT, typically 4–7 days. Free survey, fixed written quote.

